Kevin checks out a new kitchen table and the centerpiece of the kitchen, a three inch thick teak countertop. Rich shows off a second floor bathroom, then drops in on the bathtub refinishers working on the third floor. They’ll repair the guest bathtub, which has terrible paint and a marred finish. On the second floor again, Kevin speaks to the closet system designer, and on the first floor he helps Mark Ferrante install tile on the kitchen wall. Norm and Tom replace a newel post finial and then Kevin joins Tom in the basement to discuss the work done there. Finally, Norm supervises the return of the refurbished pool table.