Login or register  
TV
<-- Previous EpisodeNext Episode -->

The This Old House Hour: Cambridge Project, Part 8 of 15

Tinted primer is applied with airless sprayers; the second-floor windows are trimmed; the custom copper half-round gutters are installed; the zero-clearance fireplace insert is examined. In the second half: adding interior window trim; installing a device that will heat a swimming pool using the excess heat produced by a central air conditioner.

Source: PBS

Episode Info


Episode number: 11x8
Airdate: Thursday December 06th, 2012

Director: (Unknown)
Writer: (Unknown)


Missing Information
Click here to add Episode Notes
Click here to add Music
Click here to add Episode Quotes
Click here to add Episode Goofs
Click here to add Cultural References
Click here to add Episode References
Click here to add Analysis
 
Flash
Recent news