Login or register  
TV
<-- Previous EpisodeNext Episode -->

Work continues on the Brooklyn brownstone with the re-installation of the white oak entry doors. In the kitchen, both the appliances and sink are connected and a pot filler is placed over the range. Inside the master bedroom, a temporary wall is added to create a nursery, plus furniture is selected. Also in this episode, how to install a ventilation system in a bathroom, and lawn care without the use of pesticides or chemicals.

Episode Info


Episode number: 7x24
Airdate: Thursday March 19th, 2009

Director: (Unknown)
Writer: (Unknown)


Missing Information
Click here to add Episode Notes
Click here to add Music
Click here to add Episode Quotes
Click here to add Episode Goofs
Click here to add Cultural References
Click here to add Episode References
Click here to add Analysis
 
Flash
Recent news

Last Christmas - Doctor Who Recap

Clara is asleep at home when something crashes down on her rooftop,..

Underdog Undateable Renewed for Second Season

It looks like Baby bird Justin will have another season to perfect his..