| [–] |
Show Menu |
•
•
•
•
•
•
•
• (2)
•
• |
| [+] |
Empty Sections |
• (0)
• (0)
• (0)
• (0)
• (0)
• (0)
• (0)
• (0)
• (0)
• (0)
• (0)
• (0)
• (0)
• (0)
• (0)
• (0)
|
| [+] |
Show Contribs |
•
•
•
•
•
•
•
•
•
•
•
•
•
•
• |
| [+] |
Episode Contribs |
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
• |
|
This Old House Hour :: Episode 24 (07x24)
 |
Episode Information |
| |
| Title: | Episode 24 |
| Episode #: | 07x24 |
| Original Airdate: | Thursday March 19th, 2009 |
|
| | Episode Crew | | Director: | (Unknown) | | Writer: | (Unknown) |
|
|
 |
Episode Summary |
| |
[x] Remove Ad
Work continues on the Brooklyn brownstone with the re-installation of the white oak entry doors. In the kitchen, both the appliances and sink are connected and a pot filler is placed over the range. Inside the master bedroom, a temporary wall is added to create a nursery, plus furniture is selected. Also in this episode, how to install a ventilation system in a bathroom, and lawn care without the use of pesticides or chemicals. | | There are no foreign summaries for this episode: Contribute |
| |
|
 |
Guest Stars |
| |
No Guest Stars Found (Add Here) |
 |
Episode Notes |
| |
|   |
 |
Featured Songs |
| |
|   |
 |
Episode Quotes |
| |
|   |
 |
Episode Goofs |
| |
|   |
 |
Cultural References |
| |
|   |
 |
Episode References |
| |
|   |
 |
Analysis |
| |
|   |
|